Ground-mounted solar plant
Under construction

Ground-mounted solar plant - Champvert-Marcy

ABOUT THE PROJECT

In Champvert, in the Nièvre region, Sireos is supporting Wpd in the construction of a major power plant that combines renewable energy production with the maintenance of local agricultural activity.

Installed capacity
140.6

Non luctus et vulputate risus eros feugiat viverra risus turpis. Nascetur morbi erat cursus non.

Photovoltaic modules
226,000

Non luctus et vulputate risus eros feugiat viverra risus turpis. Nascetur morbi erat cursus non.

Inverters
349

Non luctus et vulputate risus eros feugiat viverra risus turpis. Nascetur morbi erat cursus non.

Completion date
2026

ABOUT SIREOS

A project with dual agricultural use

Beyond its energy dimension, the project is based on a logic of agricultural co-activity: five farmers continue their sheep farming operations directly beneath the photovoltaic modules, while cattle farming is maintained on the neighboring plots. This synergy between renewable energy production and agricultural activity helps to preserve the land's purpose, without soil artificialization, while contributing to the long-term viability of local farms.
On this project, SIREOS acts as the EPC contractor, from construction to the commissioning of the plant, and also provides operation and maintenance for the first two years following handover.

‍

Implementation stages

From study to commissioning

01

Site preparation and security

The first phase involved preparing and securing the site: creating access points, building service roads, and installing fencing. In parallel, over 20 km of trenches were excavated to route electrical networks between the plant's various pieces of equipment.

‍

02

Foundations and photovoltaic structures

The photovoltaic structures were installed on driven piles, which serve as the plant's foundations. The teams then proceeded to assemble the structures and install the 226,000 photovoltaic modules.

‍

03

Electrical connections

Connecting the equipment was a major part of the project. The 226,000 modules are linked to the 349 inverters by over 1,000 km of DC cables. The inverters are then connected to the 14 33 kV transformer substations via over 50 km of low-voltage AC cables. Finally, the 14 substations are connected to the HVB substation by over 20 km of high-voltage AC cables.

‍

04

Control, commissioning, and operation

The final phase involved installing sensors and automated systems, as well as testing and inspecting the equipment. Today, Sireos teams are handling the power-up and commissioning of the plant. Following construction, Sireos will also provide operations and maintenance for the site for the first two years after handover.

‍

Grue installant un conteneur de stockage d'énergie sur un chantier Sireos
Contact us

Have a project in mind?

Ground-mounted solar plants, hybrid projects, agrivoltaics, solar carports… our teams support you from design through to operation and maintenance, tailoring our approach to the specific needs of every project.

OUR PROJECTS

A few stories written with our clients

Ground-mounted solar plant - Champvert-Marcy

140.6
MWc
Installed capacity

Hybrid Power Plant - Vert

77.2
MWc
Installed capacity

60 MWh multi-site BESS

MWc
-
60
MWh
Installed capacity

Ground-mounted solar plant - Pithiviers

Sireos rehabilitates a former industrial brownfield for Corsica Sole in Pithiviers
12.5
MWc
Installed capacity

Ground-mounted solar plant - La Ferté-Saint-Aubin

10.5
MWc
Installed capacity